When do you need to notify us?
The plumbing work which you need to notify us in advance about is detailed below. Please note that where the installation is 2, 4(b) or 4(f), no notification is required if the work is done by an approved plumber . However, when the work is finished, a copy of the compliance certificate must be sent to the person who commissioned the work.
In the case of a Reduced Pressure Zone (RPZ) assembly, the contractor must also notify Southern Water .
- The erection of a building or structure not being a pond or swimming pool
- The extension or alteration of a water or plumbing system on any premises other than a domestic house
- A material change of use of the premises
- The installation of:
- A bath having a capacity, as measured to the centre line of the overflow, of more than 230 litres.
- A bidet with an ascending spray or flexible hose.
- A shower unit of a type specified by the regulator.
- A pump or booster drawing more than 12 litres per minute, connected directly or indirectly to a supply pipe.
- A unit which incorporates reverse osmosis.
- A water treatment unit which produces a wastewater discharge or which requires the use of water for regeneration or cleaning.
- An RPZ valve assembly or other mechanical device for protection against a fluid which is in Fluid Category 4 or 5.
- A garden watering system unless designed to be operated by hand.
- Any water system laid outside a building either less than 750mm or more than 1350mm below ground level (including point of entry to a premise).
- The construction of a pond or swimming pool with a capacity greater than 10,000 litres which is designed to be replenished by automatic means with water supplied by the statutory water supplier.